Split System Replacement in Capalaba – Office Air Conditioning

Jaric completed a commercial split system replacement in Capalaba, upgrading an upstairs office air conditioner to a Mitsubishi Heavy Industries BRONTE reverse cycle system with built-in Wi-Fi. With the outdoor unit located on the roof, the installation required a 26ft self-levelling scissor lift to safely access and replace the equipment. The project included new refrigeration connections, electrical components and drainage arrangements.

Project at a Glance

Service: Split system replacement
System: Mitsubishi Heavy Industries Bronte + Wi-Fi
Capacity: 7.1kW cooling | 8.0kW heating

The Challenge

The upstairs office required replacement of both its indoor and outdoor air conditioning units. With the outdoor unit on the roof, the job needed specialised access.

The Solution

  • Arranged rooftop access: Used a 26ft self-levelling diesel scissor lift for removal and installation.
  • Replaced the complete system: Installed the Bronte indoor unit and roof-mounted condenser in the existing locations.
  • Renewed essential connections: Replaced pipework, cabling and mounting equipment, adding a dedicated circuit, isolator and drainage arrangements.

The Results

Before
An existing office system requiring replacement.

After
A new reverse-cycle system with built-in Wi-Fi.

Locations retained, connections renewed
The installation kept the established unit positions while replacing essential supporting components.

Does Your Office Air Conditioner Need Replacing?

Jaric can assess the system, access requirements and installation options.

Get an Office Air Conditioning Quote