
Client: Commercial Customer
Location: Capalaba, QLD 4157
Year Completed: 2026
Jaric completed a commercial split system replacement in Capalaba, upgrading an upstairs office air conditioner to a Mitsubishi Heavy Industries BRONTE reverse cycle system with built-in Wi-Fi. With the outdoor unit located on the roof, the installation required a 26ft self-levelling scissor lift to safely access and replace the equipment. The project included new refrigeration connections, electrical components and drainage arrangements.
Service: Split system replacement
System: Mitsubishi Heavy Industries Bronte + Wi-Fi
Capacity: 7.1kW cooling | 8.0kW heating
The upstairs office required replacement of both its indoor and outdoor air conditioning units. With the outdoor unit on the roof, the job needed specialised access.
Before
An existing office system requiring replacement.
After
A new reverse-cycle system with built-in Wi-Fi.
Locations retained, connections renewed
The installation kept the established unit positions while replacing essential supporting components.
Jaric can assess the system, access requirements and installation options.
Get an Office Air Conditioning Quote
Related project: BCF Capalaba Rooftop Replacement
