Split System Replacement in Cleveland – Redland Dance

Jaric completed a commercial split system replacement in Cleveland for Redland Dance, replacing an existing air conditioner assessed as beyond economical repair. The project involved installing a 7.0kW TECO 3D Platinum reverse cycle system in the second-floor space, retaining the existing indoor and outdoor unit positions.

Project at a Glance

Industry: Dance education
Service: Commercial split system replacement
System: TECO 3D Platinum
Capacity: 7.0kW cooling / 7.0kW heating
Model: TWS72H3DVJT-Set

The Challenge

Following an earlier assessment, Jaric considered the existing split system at Redland Dance beyond economical repair. The second-floor installation required a replacement that retained the existing indoor and outdoor positions.

The Solution

  • Decommissioned and removed the existing split system, replacing the indoor and outdoor units.
  • Installed a TECO 3D Platinum reverse cycle system, retaining the indoor wall position and wall-bracket arrangement for the outdoor unit.
  • Provided the replacement installation connections, including a new isolator and PVC trunking for the external pipework and interconnecting cables.

The Results

Before: An existing split system assessed as beyond economical repair.
After: A replacement TECO reverse cycle system installed for the second-floor space.

Heating and cooling: Rated capacity of 7.0kW in both modes.

Layout retained: Replacement equipment installed in the existing positions, avoiding the need to relocate the indoor unit within the room.

Is Your Business Air Conditioner Ready for Replacement?

Ask Jaric to assess your existing system and recommend a replacement suited to your premises.

Request a Commercial Air Conditioning Quote

Related project: Commercial air conditioning replacement in Kallangur