
Client: Commercial Customer
Location: Cleveland, QLD 4163
Year Completed: 2026
Jaric completed a commercial split system replacement in Cleveland for Redland Dance, replacing an existing air conditioner assessed as beyond economical repair. The project involved installing a 7.0kW TECO 3D Platinum reverse cycle system in the second-floor space, retaining the existing indoor and outdoor unit positions.
Industry: Dance education
Service: Commercial split system replacement
System: TECO 3D Platinum
Capacity: 7.0kW cooling / 7.0kW heating
Model: TWS72H3DVJT-Set
Following an earlier assessment, Jaric considered the existing split system at Redland Dance beyond economical repair. The second-floor installation required a replacement that retained the existing indoor and outdoor positions.
Before: An existing split system assessed as beyond economical repair.
After: A replacement TECO reverse cycle system installed for the second-floor space.
Heating and cooling: Rated capacity of 7.0kW in both modes.
Layout retained: Replacement equipment installed in the existing positions, avoiding the need to relocate the indoor unit within the room.
Ask Jaric to assess your existing system and recommend a replacement suited to your premises.
Request a Commercial Air Conditioning Quote
Related project: Commercial air conditioning replacement in Kallangur
